Purpose. A workshop that produces decisions and mapped process, not a
transcript of opinions.
Overview
| Field | Detail |
|---|
| Workshop title | |
| Objective | One measurable outcome — e.g. "a mapped release process with handoffs and cycle times" |
| Date and time | |
| Location / platform | |
| Facilitator | |
| Note-taker | |
Participants
| Name | Role | Organisation | Why they are here |
|---|
| | | |
| | | |
Cross-functional by design. Include the people who perform the work, not only the
people who manage it.
Pre-work
| Item | Owner | Due |
|---|
| Pre-workshop survey issued | | |
| Existing process documentation requested | | |
| Current architecture diagram circulated | | |
| Room, board and materials confirmed | | |
Agenda
| Time | Activity | Description | Lead |
|---|
| 10 min | Introduction | Welcome, objectives, shape of the session | |
| 20 min | Current state | Environment, tooling, process, constraints | |
| 30 min | Key areas | Deep dive: infrastructure, architecture, security, compliance | |
| 30 min | Working session | Identify pain points and propose improvements | |
| 20 min | Actions and next steps | Summarise, assign owners and dates | |
| 10 min | Q&A and close | Open floor, follow-up commitments | |
Facilitation guide
Opening
- State the objective in one sentence and write it where everyone can see it.
- Confirm the agenda and the time boundaries.
- Set the rule: no blame, describe the system.
Current state
- Ask for the last real example, not the general process.
- Map the steps on the wall as they are described.
- Note the handoffs — the team boundary is where delay lives.
- Ask for time estimates and mark them as estimates.
Key areas
Prompts by area:
| Area | Prompts |
|---|
| Infrastructure | How is it provisioned? Who can change it? How long does a change take? |
| Architecture | What are the components? Where are the dependencies? What breaks first? |
| Security | Where are the controls? Which ones obstruct work? How is evidence produced? |
| Compliance | What must be provable, to whom, how often? |
| Operations | What alarms exist? What does on-call actually do at 3 a.m.? |
Working session
- Use a structured format — dot voting, impact/effort, or silent idea generation
followed by grouping.
- Capture every pain point verbatim, then cluster.
- For each cluster, ask: what would have to change, and who owns it?
Close
- Read back the decisions and actions.
- Confirm owners and dates in the room.
- State what happens next and when the summary will arrive.
Captured during the session
Pain points
| # | Pain point (verbatim) | Area | Impact | Affected roles |
|---|
| 1 | | | | |
Current-state process
| Step | Owner | System | Duration | Handoff to |
|---|
| | | | |
Decisions
Actions
Post-workshop
| Task | Owner | Due |
|---|
| Summary report circulated | | Within 2 working days |
| Action tracker created | | |
| Feedback survey issued | | |
| Follow-up meeting scheduled | | |
Materials
- Whiteboard or shared digital board
- Sticky notes and markers, or the digital equivalent
- Printed current-state architecture
- Attendance sheet
- The workshop deck