Skip to main content

Maturity model

A maturity model is only useful if it changes what you do next. Qbits uses a five-level model across five dimensions, scored against observable evidence rather than opinion, and re-scored at defined intervals to show movement.

Levels​

LevelNameWhat it looks likeFailure mode
1InitialProcesses are ad hoc and reactive. Success depends on individual effort rather than standard practice.Heroics mask systemic fragility; knowledge leaves with people.
2RepeatableBasic processes exist but are not standardised or documented. Teams work in inconsistent, siloed ways.Each team is a separate island; improvements do not spread.
3DefinedProcesses are documented and standardised across the organisation. Collaboration is beginning; some silos remain.Documentation drifts from reality; the standard is aspirational.
4ManagedProcesses are measured. Cross-team collaboration is effective, and automation improves efficiency.Metrics exist but are not connected to business outcomes.
5OptimisedProcesses are automated, integrated and continuously improved. The organisation invests in innovation.Improvement becomes an end in itself; complexity accumulates.

Most organisations sit at level 2–3 overall while scoring 4 in one dimension — typically automation in a single team — and 1 in another. The spread is more informative than the average.

Dimensions​

Process​

Are delivery processes defined, followed and measured?

  • 1 — No consistent process; each project invents one.
  • 3 — A documented SDLC exists and is generally followed.
  • 5 — Process is measured, reviewed, and changed based on evidence.

Tools and technology​

Is the toolchain fit for purpose and consistently used?

  • 1 — Tooling is ad hoc, overlapping, or unmaintained.
  • 3 — Standard toolchain exists and is adopted across teams.
  • 5 — Toolchain is integrated end to end and evaluated on a cycle.

Team and collaboration​

Can teams deliver without organisational friction?

  • 1 — Strict silos; handoffs are the primary delivery mechanism.
  • 3 — Cross-functional teams exist in places; collaboration is improving.
  • 5 — Teams own services end to end; information flows without escalation.

Automation​

How much of the delivery path runs without human intervention?

  • 1 — Manual builds, manual deployments, manual infrastructure.
  • 3 — CI runs; deployment may still be manual or partially scripted.
  • 5 — Commit to production is automated, gated and reversible; infrastructure and policy are code.

Governance and compliance​

Are controls embedded in the delivery path rather than bolted on?

  • 1 — Controls are manual, retrospective, and often bypassed.
  • 3 — Controls are documented and applied at release.
  • 5 — Controls are automated as policy, evidenced continuously, and versioned.

Scoring rules​

  1. Score the observed practice, not the documented intent. If the standard exists but is routinely bypassed, the score is what actually happens.
  2. Score each dimension separately. Do not average until the profile is complete — the gaps are the point.
  3. Require evidence. Every score is supported by at least one artefact: a pipeline, a runbook, a repository, an interview quote, a dashboard.
  4. Agree the score with the customer. A disputed score is a finding in itself and usually reveals a visibility gap.
  5. Re-score on a fixed cadence. Quarterly for active engagements; the direction of travel matters as much as the level.

Scorecard​

DimensionLevelEvidenceTargetOwner
Process
Tools and technology
Team and collaboration
Automation
Governance and compliance
Overall

From score to roadmap​

The gap between current level and target level, weighted by business importance, determines sequencing. A dimension scoring 1 in something the business depends on outranks a dimension scoring 3 in something peripheral.

A typical progression:

  • Level 1 → 2: establish source control, a repeatable build, and documented environments. This is foundational; nothing above it holds without it.
  • Level 2 → 3: standardise the pipeline across teams, codify infrastructure, and document operating procedures.
  • Level 3 → 4: instrument the delivery path and the workload, then manage against the measures.
  • Level 4 → 5: automate the controls themselves and close the feedback loop between production signals and delivery decisions.